Configure your system

800 W
25 ft (7.6 m)
65%
Source outlets
Hardwired IQ System Controller
Load connection
Hardwired 240V / L14-30 Transfer Switch
Verified Hardware Match

Check current bundle pricing for the Enphase IQ Battery 5P (Dual 10kWh Bank) plus a transfer switch kit for this setup.

As an Amazon Associate, we earn from qualifying purchases.

Verified Compatible

Enphase IQ Battery 5P (Dual 10kWh Bank) handles 3,200 W continuous and 9,500 W surge with headroom.

4,480 W of continuous capacity left for other circuits.

Continuous load
42%
Runtime (no sun)
4.1 hrs
65% duty · 85% inverter eff.
Solar recharge
15.6 hrs
3.5 sun-days at 800 W
Min. copper wire
12 AWG
0.5% drop @ 25 ft
Overcurrent device
20A Breaker
13.3A load × 1.25 = 16.7A
Live schematic & breaker sizing diagram 120/240V Split-Phase • NEC 125% Rule
SOLAR PV INPUT 800 W PV MC4 / XT60 · MPPT POWER SOURCE / INVERTER Enphase IQ Battery 5P (Dual 10kWh Bank) 10,000 Wh • 7,680 W 15,360 W surge • 120/240V 42% load 20A OCPD 12 AWG Cu 13.3A @ 240V CONNECTED LOAD 3-Ton Central Air Conditioner (Standard… 3,200 W running 9,500 W surge 240V load

Engineering report · reviewed against NEC 2026 & BS 7671:2018+A2

Engineering Breakdown: Running a 3-Ton Central Air Conditioner (Standard LRA) on the Enphase IQ Battery 5P (Dual 10kWh Bank)

US/NA: Verified Compatible UK/EU/AU: Verified Compatible 42% inverter utilization

When pairing the Enphase IQ Battery 5P (Dual 10kWh Bank) (10,000 Wh LiFePO4 capacity, 7,680 W continuous, 15,360 W surge) with a 3-Ton Central Air Conditioner (Standard LRA) (3,200 W running, 9,500 W starting surge), the system operates at 42% of continuous inverter capacity on a 240 V North American circuit and 42% on a 230 V UK/EU/AU circuit. At a 100% duty cycle and 85% inverter efficiency, a full battery delivers roughly 2.7 hrs of off-grid runtime. Wiring the connection over a 25 ft run calls for a 20 A breaker and 12 AWG copper, terminated at a Hardwired 240V / L14-30 Transfer Switch connection.

1. Compatibility Verdict & Inverter Load Utilization

In North American mode the 3-Ton Central Air Conditioner (Standard LRA) loads the Enphase IQ Battery 5P (Dual 10kWh Bank)'s inverter to 42% of its 7,680 W continuous rating and 62% of its 15,360 W surge rating. Both figures are under the 80% sustained-load guideline, so this is a comfortable, verified match with 4,480 W of spare capacity for lights, a router or a refrigerator on the same unit.

CheckLoad requiresEnphase IQ Battery 5P providesUS/NAUK/EU/AU
Continuous output 3,200 W 7,680 W Pass Pass
Start-up surge 9,500 W 15,360 W Pass Pass
Voltage 240 V / 230 V 120/240 V / 230 V Pass Pass
Connection Hardwired 240V / L14-30 Transfer Switch Hardwired IQ System Controller UK/EU/AU: Hardwired via DP isolator · IEC 60309 32A

Compressor-driven HVAC equipment is the hardest category for any inverter because of locked-rotor amperage (LRA): for a fraction of a second the motor pulls 3.0× its running power (9,500 W here). The Enphase IQ Battery 5P (Dual 10kWh Bank) is rated for 15,360 W of surge, which covers that inrush. Thermostat cycling means the compressor rarely runs 100% of the time; mild weather typically produces 30–50% duty cycles, while peak summer afternoons push toward 80–100%. Fitting a soft-start module (Micro-Air EasyStart, SoftStartRV or a variable-speed inverter compressor) is the single cheapest way to make a marginal pairing reliable.

The Enphase IQ Battery 5P (Dual 10kWh Bank) is a permanently installed hybrid battery. It sits behind a gateway or system controller, so loads are fed from the home's own panel rather than from outlets on the unit.

2. Real-World Runtime by Duty Cycle

Nameplate capacity is not usable capacity. DC-to-AC conversion, battery management overhead and cell protection reduce the 10,000 Wh rating to about 8,500 Wh of deliverable AC energy (85% system efficiency). Duty cycle is the share of each hour the load actually draws its running power — thermostats, pressure switches and intermittent use all lower it.

Runtime (h) = (10,000 Wh × 0.85) ÷ (3,200 W × duty cycle)
Duty cycleAverage drawRuntime (no solar)Energy per 24 h
25% 800 W 10.6 hrs 19.2 kWh
50% 1,600 W 5.3 hrs 38.4 kWh
65% 2,080 W 4.1 hrs 49.9 kWh
100% 3,200 W 2.7 hrs 76.8 kWh

Even at a 50% duty cycle the battery lasts 5.3 hrs, so plan on solar, grid or generator recharging for anything longer than an evening outage.

3. NEC 125% Breaker & Copper Wire Gauge Sizing

NEC 210.19(A) and 210.20(A) require conductors and overcurrent devices for continuous loads — anything running three hours or more, which includes EV charging and HVAC — to be rated at 125% of the load current. For this pairing: 3,200 W ÷ 240 V = 13.3 A, × 1.25 = 16.7 A, which rounds up to the next standard NEC 240.6 size of 20 A. The conductor must be protected by that breaker (75 °C ampacity at least 20 A) and keep round-trip voltage drop at or below 3%, so longer runs are upsized.

Breaker ≥ (3,200 W ÷ 240 V) × 1.25 = 16.7 A → 20 A
Voltage drop % = (2 × L × I × R) ÷ V × 100

North America (NEC, THHN copper, 75 °C)

One-way distanceBreakerMin. copperVoltage dropNote
25 ft (7.6 m) 20 A 12 AWG 0.54% Sized by ampacity
50 ft (15.2 m) 20 A 12 AWG 1.07% Sized by ampacity
75 ft (22.9 m) 20 A 12 AWG 1.61% Sized by ampacity
100 ft (30.5 m) 20 A 12 AWG 2.14% Sized by ampacity

UK / EU / Australia (IEC 60364 / BS 7671, PVC copper, method C)

IEC-based codes size protection by design current rather than a blanket 125% multiplier: Ib ≤ In ≤ Iz. At 230 V the load draws 13.9 A, so a 16 A Type B/C MCB with RCD protection applies. In the UK, BS 7671 Section 722 additionally requires a dedicated circuit and Type A or Type B RCD for EV charge points.

One-way distanceMCBMin. cableVoltage drop
7.5 m (25 ft) 16 A 1.5 mm² 1.10%
15 m (49 ft) 16 A 1.5 mm² 2.20%
22.5 m (74 ft) 16 A 2.5 mm² 2.02%
30 m (98 ft) 16 A 2.5 mm² 2.69%

Because the current is modest, 12 AWG copper stays within the voltage-drop target all the way to 100 ft.

4. Solar Array Recharge Time Breakdown

The Enphase IQ Battery 5P (Dual 10kWh Bank) accepts up to 12,000 W of photovoltaic input. Real arrays rarely deliver nameplate output, so we apply an 80% harvest factor for MPPT conversion, cell temperature and soiling, and convert hours to days using 4.5 peak-sun-hours — a conservative annual average for the US, southern Europe and Australia (UK winters can fall below 1.5).

PV arrayReal harvest0–100% rechargeSun-days @ 4.5 PSHNet with load @ 50%
800 W 640 W 15.6 hrs 3.5 −960 W
1,600 W 1,280 W 7.8 hrs 1.7 −320 W
3,000 W 2,400 W 4.2 hrs 0.9 +800 W
6,000 W 4,800 W 2.1 hrs 0.5 +3,200 W
12,000 W 9,600 W 1.0 hrs 0.2 +8,000 W

A typical 800 W portable array refills the battery in about 15.6 hrs of strong sun, while maxing out the 12,000 W input cuts that to 1.0 hrs. To fully offset the 3-Ton Central Air Conditioner (Standard LRA) at a 50% duty cycle (1,600 W average) during daylight you need roughly 2,000 W of panels, which this unit can accept.

5. Frequently Asked Questions

Can the Enphase IQ Battery 5P (Dual 10kWh Bank) run a 3-Ton Central Air Conditioner (Standard LRA)?

Yes. The Enphase IQ Battery 5P (Dual 10kWh Bank) delivers 7,680 W continuous and 15,360 W surge, covering the 3-Ton Central Air Conditioner (Standard LRA)'s 3,200 W running and 9,500 W start-up draw at 42% inverter utilization.

How long will the Enphase IQ Battery 5P (Dual 10kWh Bank) run a 3-Ton Central Air Conditioner (Standard LRA)?

With 10,000 Wh of capacity and 85% inverter efficiency, expect about 2.7 hrs of continuous operation and 5.3 hrs at a 50% duty cycle. Adding solar input during the day extends this further.

What breaker and wire size do I need to connect a 3-Ton Central Air Conditioner (Standard LRA) to the Enphase IQ Battery 5P (Dual 10kWh Bank)?

In the US, 3,200 W at 240 V is 13.3 A; applying the NEC 125% continuous-load rule gives 16.7 A, so use a 20 A breaker and 12 AWG copper for runs up to 25 ft (0.5% voltage drop). In 230 V markets the load draws 13.9 A, protected by a 16 A MCB on 1.5 mm² cable for runs up to 7.5 m. Receptacle: Hardwired 240V / L14-30 Transfer Switch (US) or Hardwired via DP isolator · IEC 60309 32A (UK/EU/AU).

How long does it take to recharge the Enphase IQ Battery 5P (Dual 10kWh Bank) with solar panels?

With an 800 W array and an 80% real-world harvest factor, a full recharge takes about 15.6 hrs of peak sun (3.5 days at 4.5 peak-sun-hours). At its maximum 12,000 W solar input it drops to 1.0 hrs.

Methodology & safety note

Specifications come from manufacturer datasheets in our open dataset; ampacity and resistance values follow NEC Table 310.16 and Chapter 9 Table 8, and BS 7671 Appendix 4. Calculations assume copper conductors, 30 °C ambient and no bundling derating. Inverter-to-panel connections require a listed transfer switch or interlock to prevent back-feeding the grid. These results are an engineering estimate, not a substitute for a licensed electrician and local permit. See our methodology and safety disclaimer.

Status dots show the North American verdict: compatible, conditional, not compatible.

Other loads on the Enphase IQ Battery 5P (Dual 10kWh Bank)

All 50 loads on the Enphase IQ Battery 5P (Dual 10kWh Bank) →

Other power stations for the 3-Ton Central Air Conditioner (Standard LRA)

Compare every source for this load →

More HVAC & Climate Control on the Enphase IQ Battery 5P (Dual 10kWh Bank)